{"id":1517,"date":"2023-04-01T10:00:00","date_gmt":"2023-04-01T08:00:00","guid":{"rendered":"https:\/\/kpb.h2a.lu\/mesures\/analyser-la-situation-energetique-de-son-entreprise\/"},"modified":"2026-07-13T16:04:32","modified_gmt":"2026-07-13T14:04:32","slug":"analysis-of-your-companys-energy-situation","status":"publish","type":"mesures","link":"https:\/\/kpb.h2a.lu\/en\/measures\/analysis-of-your-companys-energy-situation\/","title":{"rendered":"Analysis of your company&#8217;s energy situation"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In order to have an overview of a company&#8217;s energy situation, it is important to monitor its consumption. Carrying out an energy analysis enables you to detect over-consumption and determine the measures you need to take to improve. With a view to continuous improvement, regular monitoring is essential.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Monitoring the energy situation<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Record and monitor the consumption<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use a consumption spreadsheet (<a href=\"https:\/\/environnement-entreprise.be\/boite-a-outils\/tableurs-de-suivi\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/environnement-entreprise.be\/boite-a-outils\/tableurs-de-suivi\/\" rel=\"noreferrer noopener\">example<\/a>) to get an overview of the energy situation and to create the framework for analysing and monitoring consumption.<\/li>\n\n\n\n<li>Consumption data can be consulted from:\n<ul class=\"wp-block-list\">\n<li>invoices<\/li>\n\n\n\n<li>meters<\/li>\n\n\n\n<li>or, the national energy data platform <a href=\"https:\/\/www.leneda.lu\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">LENEDA<\/a><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Compare consumption with actual needs<\/li>\n\n\n\n<li>Identify consumption indicators, e.g. energy consumption per surface area.<\/li>\n\n\n\n<li>Take stock of energy-consuming machinery, noting details such as age, power, operating hours, etc.<\/li>\n\n\n\n<li>Comfort heat consumption should be calculated using degree days<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>To go further:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>Introduction of an automated consumption monitoring system<\/strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation of connected sub-meters<\/li>\n\n\n\n<li>Implementation of an automated IT solution<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Carrying out a &#8220;Potenzialcheck&#8221; (energy diagnostic) with a <a href=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/energie\/expert-utilisation-energie\/experts-audits-energetiques-agrees.pdf\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/energie\/expert-utilisation-energie\/experts-audits-energetiques-agrees.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">consulting engineering office<\/a><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Analysis of the energy consumption of a building, business or organisation. The analysis aims to determine the level of efficiency of each consumption item and leads to an assessment of potential savings.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2024\/02\/Potenzialcheck_EN_May23_VF.pdf\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2024\/02\/Potenzialcheck_EN_May23_VF.pdf\" rel=\"noreferrer noopener\">Technical questionnaire of the energy analysis &#8220;Potenzialcheck&#8221;<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2024\/02\/Rapport-type-du-diagnostic-energetique_Potenzialcheck_FR.docx\" data-type=\"link\" data-id=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2024\/02\/Rapport-type-du-diagnostic-energetique_Potenzialcheck_FR.docx\" target=\"_blank\" rel=\"noreferrer noopener\">Model report for the energy diagnostic &#8220;Potenzialcheck&#8221; (FR)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2023\/04\/Explicatif-du-diagnostic-energetique-_Potenzialcheck_FR.docx\" data-type=\"link\" data-id=\"https:\/\/kpb.h2a.lu\/wp-content\/uploads\/2023\/04\/Explicatif-du-diagnostic-energetique-_Potenzialcheck_FR.docx\">Guide to energy diagnostics &#8220;Potenzialcheck&#8221; (FR)<\/a><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Energy audit by a <strong><a href=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/energie\/expert-utilisation-energie\/experts-audits-energetiques-agrees.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">consulting engineering office<\/a><\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Carrying out an energy audit in accordance with standard EN-16247 enables a company to carry out a detailed analysis of its energy situation. Based on the results of this analysis, energy-saving measures are identified.<\/p>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>Please note:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Companies for which conducting an energy audit in accordance with standard EN-16247 is a legal obligation, pursuant to the Law of 5 August 1993 amended by the Law of 5 July 2016, are not eligible for the state aid provided under this scheme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For further information, please visit the following websites:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/klima-agence.lu\/en\/energy-audits\" target=\"_blank\" rel=\"noreferrer noopener\">Klima-Agence \u2013 Mandatory energy Audits<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/urbanisme-environnement\/energie\/audits-performances-energetiques\/obligation-audit-energetique.html\" target=\"_blank\" rel=\"noreferrer noopener\">Guichet public &#8211; Obligation to carry out energy audits<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>To go further:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Companies wishing to assess not only their energy consumption but also their total greenhouse gas emissions can carry out a carbon assessment. This consideres both direct emissions (on site) as well as indirect emissions linked to purchasing, transport, and product use. This approach provides a comprehensive overview of the carbon footprint and helps to define concrete reduction measures. <a href=\"https:\/\/kpb.h2a.lu\/en\/measures\/calculate-the-carbon-footprint-of-your-economic-activity\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/kpb.h2a.lu\/en\/measures\/calculate-the-carbon-footprint-of-your-economic-activity\/\" rel=\"noreferrer noopener\">Find out more about this by consulting the relevant measure &#8220;Calculate the carbon footprint of your economic activity&#8221;.<\/a><\/p>\n<\/div><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener\">Fit 4 Sustainability&#8221; programme:<\/a><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Environmental study to assess the impact of the company&#8217;s activity on the environment, according to the chosen focus area(s) (water, energy, circularity, etc.).<\/li>\n\n\n\n<li>A quantified action plan: the study is supplemented by various recommendations (investments, implementation of best practices, etc.) to reduce this impact in the short or long term.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Implementation of an energy management system by a <a href=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/energie\/expert-utilisation-energie\/experts-audits-energetiques-agrees.pdf\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/energie\/expert-utilisation-energie\/experts-audits-energetiques-agrees.pdf\" rel=\"noreferrer noopener\">consulting engineering office<\/a><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">An energy management system, such as <a href=\"https:\/\/www.iso.org\/files\/live\/sites\/isoorg\/files\/store\/en\/PUB100400.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">ISO 50001<\/a>, enables companies to systematically monitor the management of resources and energy. This solution also aims to evaluate and optimise resources.<\/p>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Application for subsidies<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">State subsidies<\/h4>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>Please note: incentive effect to be complied with when applying for subsidies (state or otherwise) and subject to meeting the eligibility conditions<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In order to respect the &#8220;incentive effect&#8221;, no binding commitment (cost estimation signed; payed a deposit) can be made BEFORE having received the tentative settlement from the State or the electricity and natural gas supplier following an assistance<\/p>\n<\/div><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-sme-packages\/soutien-pme\/sme-packages-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener\">SME Packages &#8211; Sustainability<\/a><\/strong>\n<ul class=\"wp-block-list\">\n<li>Financial Aid for small and medium-sized enterprises covering up to 70% of eligible costs for the implementation of a project aimed at reducing the environmental impact. The eligible project budget must be in a range from 3.000 \u20ac to 25.000 \u20ac excl. VAT.<\/li>\n\n\n\n<li>For more information:\n<ul class=\"wp-block-list\">\n<li><a href=\"mailto:ehandwierk@cdm.lu\" data-type=\"URL\" data-id=\"https:\/\/services.cdm.lu\/gestion-entreprise\/digitalisation\/sme-packages\" target=\"_blank\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a> for crafts industry<\/li>\n\n\n\n<li><a href=\"mailto:sustainability@cc.lu\" target=\"_blank\" rel=\"noreferrer noopener\">Chamber of Commerce<\/a> for businesses in the non-crafts sector<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-pme\/aides-generales-pme\/aide-service-conseil.html\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-pme\/aides-generales-pme\/aide-service-conseil.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>SME scheme &#8211; Aid for consultancy services<\/strong><\/a>\n<ul class=\"wp-block-list\">\n<li>Subsidy for small and medium-sized businesses, up to 50% of the fees of external consultants for consultancy services.<\/li>\n\n\n\n<li>Verification of project eligibility and body granting the subsidy: <a href=\"mailto:info.aide.pme@eco.etat.lu\">Ministry of the Economy<\/a> (Department for Support to SMEs)<\/li>\n\n\n\n<li>For more information:\n<ul class=\"wp-block-list\">\n<li><a href=\"mailto:subsides@houseofentrepreneurship.lu\" target=\"_blank\" rel=\"noreferrer noopener\">House of Entrepreneurship<\/a> by the Chamber of Commerce<\/li>\n\n\n\n<li><a href=\"mailto:ehandwierk@cdm.lu\" target=\"_blank\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability.html\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability.html\" target=\"_blank\" rel=\"noopener\"><strong>Fit 4 Sustainability programme<\/strong><\/a><br><br>The Fit 4 Sustainability programme provides co-financing for environmental audits and action plans on one or more topics selected by the company (energy, GHG, waste, water, etc.).<br><br><strong>Aid of up to 60%, 70% and 80%<\/strong>, depending on the size of the company, for the fees associated with carrying out an environmental study (energy audit and\/or carbon footprint assessment) and a detailed, costed action plan to reduce its consumption\/GHG emissions (medium- and long-term investments, ROI, etc.) \u2013 open to SMEs and large companies (except those that must carry out studies required by the environmental authorities, including mandatory energy audits)<br>\n<ul class=\"wp-block-list\">\n<li>For questions: <a href=\"mailto:fit4sustainability@luxinnovation.lu\" data-type=\"mailto\" data-id=\"mailto:fit4sustainability@luxinnovation.lu\">Luxinnovation<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Subsidies from electricity and natural gas suppliers<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Since 2015, natural gas and electricity suppliers have been required to help consumers achieve energy savings as part of the obligation scheme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Since then, energy suppliers have been offering support and advisory services, as well as subsidy programmes for consumers to implement energy efficiency measures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The following suppliers offer this service to companies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">enoprimes<\/a> Enovos + SUDenergie<\/li>\n\n\n\n<li><a href=\"mailto:p%73@su%64%65ne%72gie%2elu\">SUDenergie<\/a><\/li>\n\n\n\n<li><a href=\"mailto:s%75b%76e%6eti%6fn@s%75dstr%6fum%2e%6cu\">Sudstroum<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background wp-block-paragraph\">In 2026, enoprimes will celebrate its 10th anniversary. On this occasion, special incentives are being offered to businesses for any project initiated between 1 July and 31 December 2026, generating &lt; 1,500 MWh of energy savings and not already benefiting from a preferential tariff scheme.<br><br>For further details regarding eligibility criteria, please visit the website: <a href=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/enoprimes\/actions-speciales\/\" target=\"_blank\" rel=\"noopener\">Special offer \u2013 10 years of enoprimes<\/a><\/p>\n\n\n\n<p class=\"has-light-green-background-color has-background wp-block-paragraph\"><strong>N.B. Supplier subsidies can be combined with any state subsidies for the same project.<\/strong><\/p>\n","protected":false},"featured_media":666,"parent":0,"template":"","secteur":[138,142,74,129,67,76,123,77,132,68,69,62,72,71,73],"thematique":[78],"application":[102],"class_list":["post-1517","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-grocery-shop","secteur-food-trade","secteur-administration","secteur-boulanger-en","secteur-horeca-en","secteur-agriculture-viticulture","secteur-butcher-craft-industry","secteur-aid-and-care-sector","secteur-carpentry","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-analysis"],"acf":[],"_links":{"self":[{"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/mesures\/1517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":28,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/mesures\/1517\/revisions"}],"predecessor-version":[{"id":3488743,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/mesures\/1517\/revisions\/3488743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/media\/666"}],"wp:attachment":[{"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/media?parent=1517"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/secteur?post=1517"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/thematique?post=1517"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/kpb.h2a.lu\/en\/wp-json\/wp\/v2\/application?post=1517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<br />
<b>Notice</b>:  ob_end_flush(): Failed to send buffer of zlib output compression (1) in <b>/home/clients/bbb2624fbe44f990f6efee0f16c5d807/sites/kpb.h2a.lu/wp-includes/functions.php</b> on line <b>5581</b><br />
<br />
<b>Notice</b>:  ob_end_flush(): Failed to send buffer of zlib output compression (1) in <b>/home/clients/bbb2624fbe44f990f6efee0f16c5d807/sites/kpb.h2a.lu/wp-includes/functions.php</b> on line <b>5581</b><br />
